Cloud Migration
Workload assessment, rightsizing and phased migration to Azure or AWS with a documented rollback plan.
Azure and AWS migration, virtualisation, Microsoft 365 and a backup strategy that is actually tested — not just configured.
Cloud is not automatically cheaper or safer. Lifting an over-provisioned physical server into a cloud VM without rightsizing it produces a bill that grows every month, and a backup job that has never been restored is not a backup.
BS Gateway takes a workload-by-workload approach: assess what you run, decide honestly what should move and what should not, size it correctly, migrate with a rollback plan, and put a 3-2-1 backup strategy behind it with restores tested on a schedule. Where staying on-premise is the better answer, we will tell you so.
Workload assessment, rightsizing and phased migration to Azure or AWS with a documented rollback plan.
Tenant setup, mailbox and file migration, MFA enforcement and a security baseline applied from day one.
Server consolidation on VMware or Hyper-V, cutting hardware footprint, power draw and maintenance overhead.
3-2-1 backup design with offsite copies, immutability where supported, and restores tested on a schedule.
DR planning with agreed RPO and RTO targets, documented runbooks and periodic failover rehearsal.
Rightsizing, reserved capacity and lifecycle policies to stop cloud spend drifting upward month on month.
Almost never. Email, collaboration and web-facing applications usually benefit clearly. Latency-sensitive systems, large local file stores, licensing-constrained legacy applications and workloads with heavy predictable compute are often cheaper and simpler on-premise. We assess workload by workload and give you the reasoning for each.
Three copies of your data, on two different media types, with one copy offsite. It is the baseline that survives the common failure modes — hardware failure, accidental deletion, site loss and ransomware. Where the platform supports immutability, we add it, so backups cannot be encrypted or deleted by an attacker who reaches the backup system.
A Microsoft 365 migration for a 50-user organisation is typically 2–4 weeks including preparation and cutover. Server workload migrations depend heavily on data volume, application dependencies and acceptable downtime. We produce a phased plan after the assessment so you know the schedule before committing.
Yes. Most of our clients run hybrid — identity and email in the cloud, with file, application or database servers on-premise. We design the connectivity, identity synchronisation and backup to work consistently across both.
Book a free site survey and receive a written scope with an itemised bill of quantities before you commit.