Structured Cabling
Cat6 and Cat6A copper, patch panels, I/O outlets, cable management and full link certification with test reports.
Structured cabling, fibre backbone, switching, routing and enterprise Wi-Fi — designed, installed and documented to standard.
A network is the foundation every other system depends on. Cameras, cloud applications, VoIP, access control and day-to-day productivity all fail in the same way when the cabling is unlabelled, the switches are oversubscribed or the Wi-Fi was placed by guesswork instead of a survey.
BS Gateway designs and installs enterprise network infrastructure end to end — from the site survey and cable schedule through to switch configuration, VLAN segmentation, testing and as-built documentation. Every passive installation is tested and certified, and every active device is handed over with its configuration backed up and documented.
Cat6 and Cat6A copper, patch panels, I/O outlets, cable management and full link certification with test reports.
OFC laying, splicing, LIU termination and inter-building or floor-to-floor backbone links with OTDR reports.
Rack layout, power distribution, cable dressing, labelling and neat, serviceable termination.
Managed switch deployment, VLAN segmentation, link aggregation, spanning tree and inter-VLAN routing.
Predictive and on-site RF surveys, access point placement, controller configuration and seamless roaming.
Multi-site links, failover, SD-WAN and secure connectivity between head office and branches.
Cat6 handles 1 Gbps comfortably and 10 Gbps over short runs, and suits most standard office deployments. Cat6A is the right choice when you are running 10 Gbps to the desk or over full 100 m channels, powering high-draw PoE devices, or building an installation you want to last 10–15 years. We recommend based on your run lengths, PoE budget and how long you expect the cabling to stay in place.
Yes. Every copper link is certified with a cable analyser and every fibre link is OTDR tested. You receive the reports as part of the handover documentation, along with the labelling schedule and as-built drawings.
Yes. We routinely phase cabling work across evenings, weekends and floor-by-floor cutover windows so business operations continue. The migration plan is agreed before work starts.
It depends on the number of drops and site conditions. As a rough guide, a single-floor 60–80 point office is typically 5–8 working days from cabling to switch configuration. We confirm the schedule after the site survey.
Book a free site survey and receive a written scope with an itemised bill of quantities before you commit.